{"id":797,"date":"2025-11-03T15:52:51","date_gmt":"2025-11-03T07:52:51","guid":{"rendered":"https:\/\/www.liyeelectric.com\/?p=797"},"modified":"2026-10-23T10:17:12","modified_gmt":"2026-10-23T02:17:12","slug":"case-state-grid-chuzhou-etang-century-substation-ssz11-18000-110","status":"publish","type":"post","link":"https:\/\/www.liyeelectric.com\/es\/case-state-grid-chuzhou-etang-century-substation-ssz11-18000-110\/","title":{"rendered":"State Grid Chuzhou Etang (Century) Substation SSZ11-18000\/110"},"content":{"rendered":"<p>This 110kV Transformer Substation Project provides reliable power transformers for utility substations and power transmission networks. Designed for long-term operation, our transformers ensure stable power distribution with high efficiency and excellent reliability under various environmental conditions.<\/p>\n<h2>Transformer Solution for the 110kV Substation<\/h2>\n<p>The SSZ11-18000\/110 transformer was selected for a utility substation application requiring reliable voltage transformation and electrical performance.<\/p>\n<p>For an 18MVA power transformer operating in a 110kV-class network, engineering considerations include short-circuit withstand capability, insulation coordination, temperature rise, and compatibility with the substation&#8217;s voltage regulation requirements.<\/p>\n<p><a href=\"https:\/\/www.liyeelectric.com\/es\/\">Liye<\/a> Electric&#8217;s transformer manufacturing capabilities cover core fabrication, winding production, insulation processing, oil tank manufacturing, final assembly, and electrical testing.<\/p>\n<h2>Product Advantages<\/h2>\n<ul>\n<li>Low no-load and load losses for higher energy efficiency<\/li>\n<li>Short production cycle and fast delivery<\/li>\n<li>IEC, GB, ANSI and GOST standard compliance<\/li>\n<li>Excellent overload capability<\/li>\n<li>Long service life with minimal maintenance<\/li>\n<li>Factory-tested before shipment<\/li>\n<\/ul>\n<h2>Key Technical Considerations<\/h2>\n<h3>Electrical Performance and Energy Efficiency<\/h3>\n<p>Transformer efficiency is influenced by core losses, winding resistance, load conditions, and operating temperature. Appropriate electromagnetic design and manufacturing control help manage no-load and load losses during continuous substation operation.<\/p>\n<h3>Insulation and Thermal Management<\/h3>\n<p>A 110kV-class transformer requires an insulation system designed for its specified operating and withstand voltages. Winding temperature, cooling arrangement, and insulation integrity must be considered together to support equipment reliability.<\/p>\n<h3>Mechanical and Short-Circuit Strength<\/h3>\n<p>Transformer windings and support structures must withstand the mechanical forces associated with specified short-circuit conditions. Accurate winding assembly, mechanical compression, and insulation support are important manufacturing considerations.<\/p>\n<h3>Factory Testing and Quality Control<\/h3>\n<p>Liye Electric operates dedicated transformer manufacturing and testing facilities. Typical factory acceptance requirements for this equipment class include:<\/p>\n<ul>\n<li>\n<div>\n<div>\n<p>Winding resistance measurement<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Voltage ratio and vector group verification<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Insulation-related electrical tests<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>No-load loss and current measurement<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Load loss and short-circuit impedance measurement<\/p>\n<\/div>\n<\/div>\n<\/li>\n<li>\n<div>\n<div>\n<p>Additional tests required by the applicable standard and purchase specification<\/p>\n<\/div>\n<\/div>\n<\/li>\n<\/ul>\n<p>The final testing scope is determined by the approved technical requirements.<\/p>\n<h2>Manufacturing Support from Liye Electric<\/h2>\n<p>As a China Transformer Manufacturer, Liye Electric provides transformer engineering, manufacturing, and quality control support for utility substations, industrial power systems, and power transmission projects.<\/p>\n<p>Our manufacturing facilities support transformer core production, winding fabrication, insulation processing, tank manufacturing, and assembly. Technical specifications can be reviewed according to project requirements, including rated capacity, voltage ratio, impedance, cooling method, and applicable standards.<\/p>\n<p>Explore our <a href=\"https:\/\/www.liyeelectric.com\/es\/products\/110kv-power-transformer\/?utm_source=chatgpt.com\">Transformador de potencia de 110 kV<\/a> solutions for additional product information and configuration options.<\/p>\n<h2>Request a Transformer Quotation for Your Substation Project<\/h2>\n<p>Planning a 110kV substation or power distribution project?<\/p>\n<p>Liye Electric supplies high-voltage power transformers for utility networks, industrial substations, and energy infrastructure projects. Our engineering team can review your technical specifications and propose an appropriate transformer configuration.<\/p>\n<p>Please provide the required capacity, voltage ratio, frequency, impedance, cooling requirements, applicable standards, and project location.<\/p>\n<p><a href=\"https:\/\/www.liyeelectric.com\/es\/contact-us\/\">Contact Liye Electric<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>This 110kV Transformer Substation Project provides reliable power transformers for utility substations and power transmission networks. Designed for long-term operation, our transformers ensure stable power distribution with high efficiency and excellent reliability under various environmental conditions. Transformer Solution for the 110kV Substation The SSZ11-18000\/110 transformer was selected for a utility substation application requiring reliable voltage [&hellip;]<\/p>","protected":false},"author":4,"featured_media":798,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[66,69],"tags":[],"class_list":["post-797","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-case","category-local-success-stories"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/posts\/797","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/comments?post=797"}],"version-history":[{"count":0,"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/posts\/797\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/media\/798"}],"wp:attachment":[{"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/media?parent=797"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/categories?post=797"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.liyeelectric.com\/es\/wp-json\/wp\/v2\/tags?post=797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}